Integrated Preventive Maintenance Scheduling Model With Redundancy For Cutting Tools On A Single Machine

ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH(2020)

Cited 8|Views0
No score
Abstract
In this paper, we present an integrated multi-objective framework of a single machine for a single cutting tool problem. Our maintenance policy is based on performing minimal repairs in case of a minor failure and Preventive Maintenance (PM) to avoid a major failure that results in the replacement of the tool. This framework allows simultaneous optimization of the two conflicting time and cost objectives. A redundant system is proposed as a part of the model to assist the production line under a major failure. In addition, the tool's preventive maintenance time is synchronized with the completion of the machine tool's work cycle to reduce the machine's set-up time. The model was optimized using a customized Non-dominated Sorting Genetic Algorithm (NSGA-II). An experimental study based on real-market data was conducted and the results were compared with the ones obtained from classical methods.
More
Translated text
Key words
maintenance scheduling, preventive maintenance, redundancy, non-dominated sorting genetic algorithm, multi-objective optimization, time and cost trade-off
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined