大岗山水电站泄洪洞洞身硅粉混凝土施工技术
wf(2015)
Abstract
介绍了大岗山水电站泄洪洞洞身边墙和底板硅粉混凝土施工工艺,重点阐述了针对硅粉混凝土温控防裂、过流面不平整度控制及底板施工排水等难点所采取的工程措施,可为类似工程提供参考和借鉴.
MoreKey words
spillway tunnel,silica fume concrete,temperature control,flatness,Dagangshan Hydropower Station
AI Read Science
Must-Reading Tree
Example
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined