Time Series Forecasting using Genetic Algorithm A Case Study of Maintenance Cost Data For Tunnel Fans

TWELFTH INTERNATIONAL CONFERENCE ON ADVANCED ENGINEERING COMPUTING AND APPLICATIONS IN SCIENCES (ADVCOMP 2018)(2018)

引用 0|浏览0
暂无评分
摘要
Time series forecasting is widely used as a basis for economic planning, production planning, production control and optimizing industrial processes. The aim of this study has been to develop a novel two-level Genetic Algorithm (GA) to optimize time series forecasting in order to forecast cost data for fans used in road tunnels by the Swedish Transport Administration (Trafikverket). The first level of the GA is responsible for the process of forecasting time series cost data, while the second level evaluates the forecasting. The first level implements GA based on the Autoregressive Integrated Moving Average (ARIMA) model. The second level utilizes a GA based on forecasting error rate to identify proper forecasting. The results show that GA based on the ARIMA model produces good forecasting results for the labor cost data objects. It was found that a multi-objective GA based on the ARIMA model showed an improved performance. The forecasted data can be used for Life Cycle Cost (LCC) analysis.
更多
查看译文
关键词
ARIMA model,Time series forecasting,Genetic Algorithm (GA),Life Cycle Cost (LCC),Maintenance cost data
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要