Institutionalized data quality assessments: a critical pathway to improving the accuracy of integrated disease surveillance data in Sierra Leone
BMC Health Services Research(2020)
摘要
Background Public health agencies require valid, timely and complete health information for early detection of outbreaks. Towards the end of the Ebola Virus Disease (EVD) outbreak in 2015, the Ministry of Health and Sanitation (MoHS), Sierra Leone revitalized the Integrated Disease Surveillance and Response System (IDSR). Data quality assessments were conducted to monitor accuracy of IDSR data. Methods Starting 2016, data quality assessments (DQA) were conducted in randomly selected health facilities. Structured electronic checklist was used to interview district health management teams (DHMT) and health facility staff. We used malaria data, to assess data accuracy, as malaria was endemic in Sierra Leone. Verification factors (VF) calculated as the ratio of confirmed malaria cases recorded in health facility registers to the number of malaria cases in the national health information database, were used to assess data accuracy. Allowing a 5% margin of error, VF < 95% were considered over reporting while VF > 105 was underreporting. Differences in the proportion of accurate reports at baseline and subsequent assessments were compared using Z-test for two proportions. Results Between 2016 and 2018, four DQA were conducted in 444 health facilities where 1729 IDSR reports were reviewed. Registers and IDSR technical guidelines were available in health facilities and health care workers were conversant with reporting requirements. Overall data accuracy improved from over- reporting of 4.7% (VF 95.3%) in 2016 to under-reporting of 0.2% (VF 100.2%) in 2018. Compared to 2016, proportion of accurate IDSR reports increased by 14.8% (95% CI 7.2, 22.3%) in May 2017 and 19.5% (95% CI 12.5–26.5%) by 2018. Over reporting was more common in private clinics and not- for profit facilities while under-reporting was more common in lower level government health facilities. Leading reasons for data discrepancies included counting errors in 358 (80.6%) health facilities and missing source documents in 47 (10.6%) health facilities. Conclusion This is the first attempt to institutionalize routine monitoring of IDSR data quality in Sierra Leone. Regular data quality assessments may have contributed to improved data accuracy over time. Data compilation errors accounted for most discrepancies and should be minimized to improve accuracy of IDSR data.
更多查看译文
关键词
Public health surveillance, Data quality, Assessment, Sierra Leone
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要