INSTALLATION AND COMMISSIONING OF NEW EVENT TIMING SYSTEM FOR SuperKEKB

semanticscholar(2015)

引用 3|浏览2
暂无评分
摘要
The new Event Timing System was installed in 2014. The parameters of new system to operate LINAC were optimized through the commissioning which was based on the triggermonitoring and the experimental beam operation. The necessary functions for the Main Ring injection were additionally integrated in 2015. Finally we performed the study of longterm stability and confirmed the soundness of new system. The new Event Timing System is ready for the injection into Main Ring.