The KEKB 8-GeV electron / 3.5-GeV positron injector linac is almost completed and is now under commissioning. Recently, both an 8-GeV electron beam and a 3.5GeV positron beam were accelerated to the linac end. This report describes the current status of these beams with emphasis on the newly developed beam monitors being used for various stages of beam commissioning.