A higher energy intake at night-time impacts daily energy distribution and contributes to excessive weight gain during pregnancy
Nutrition(2020)
摘要
•This study analyzed longitudinal effect of nighttime intake on weight gain.•Higher nighttime intake influenced lower energy intake in morning meals.•Higher nighttime intake affected excessive weight gain in the third trimester.
更多查看译文
关键词
Pregnant women,Gestational weight gain,Pregnancy diet,Chrono-nutrition,Meal timing,Time of energy intake
AI 理解论文
溯源树
样例
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要