谷歌Chrome浏览器插件
订阅小程序
在清言上使用

Rockburst prediction and stability analysis of the access tunnel in the main powerhouse of a hydropower station based on microseismic monitoring

International Journal of Rock Mechanics and Mining Sciences(2020)

引用 54|浏览19
暂无评分
摘要
The access tunnel in the main powerhouse of the Shuangjiangkou hydropower station in China has complex geological conditions and is subject to high in situ stress in deep buried sections. Microseismic activity in the surrounding rock mass of the tunnel was monitored by a microseismic monitoring system, and rockburst was effectively predicted. Based on abundant data obtained from the microseismic monitoring, statistical parameters, which include cumulative apparent volume, the energy index, cumulative released energy and the Es/Ep value, were used to analyze the microseismic activity before and after rockburst to determine a more accurate early warning period and construction safety period. A sharp decrease in the energy index and a rapid increase in the cumulative apparent volume indicated a deterioration of the surrounding rock mass stability. The change characteristics of Es/Ep values revealed that the rockburst process underwent a transformation of compression-shear damage, tension-shear mixed damage and tension damage. Finally, based on the number of daily events N and the b value of the microseismic events, lgN/b was first established to evaluate the rockburst risk of tunnels. When the value of lgN/b was greater than 1, rockburst was more likely to occur; the larger the lgN/b value, the more severe the rockburst was. The research results provide an important reference value for the prediction of rockbursts in deep tunnels and the regulation of site construction progress.
更多
查看译文
关键词
High in situ stress,Microseismic monitoring,Rockburst,Early warning,Shuangjiangkou hydropower station
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要