Extension of the multi-frequency ECRH system at ASDEX upgrade

2016 41st International Conference on Infrared, Millimeter, and Terahertz waves (IRMMW-THz)(2016)

引用 7|浏览68
暂无评分
摘要
A multi-megawatt Electron Cyclotron Resonance Heating (ECRH) system is in routine operation at the ASDEX Upgrade (AUG) tokamak. It applies four step-tunable gyrotrons at 105 and 140 GHz with 10 s pulse length and output powers close to 1 MW. An upgrade with four more gyrotrons is underway which will double the installed power. The first two-frequency gyrotron of the new series has recently been installed. The final goal is to have around 6.5-7 MW at 140 GHz (or 5.5 MW at 105 GHz) from 8 units available in the plasma during the whole AUG discharge (10 s).
更多
查看译文
关键词
multifrequency ECRH system,ASDEX upgrade,electron cyclotron resonance heating system,four step-tunable gyrotrons,two-frequency gyrotron,frequency 105 GHz to 140 GHz
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要