Time Delay and Interface Roughness Estimation of Pavements by Modified Music with OPM: Experimental Results

2019 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM (IGARSS 2019)(2019)

引用 0|浏览5
暂无评分
摘要
In civil engineering, roadway structure evaluation is an important application which can be carried out by ground penetrating radar. This paper focuses on the estimation of the time delay and interface roughness of civil engineering structure, like pavements. The influence of interface roughness is taken into account in the signal model. Therefore, we propose a new method which allows to efficiently estimate the time delay and interface roughness. Like in [1], the modified MUSIC is used for time delay estimation. In interface roughness estimation, we propose a modified orthogonal propagator method (OPM) to estimate the interface roughness with estimated time delay. While in [1], maximum likelihood method is applied, which needs multiple dimensional search. The proposed method is tested on the experimental data. The experimental results show the performance of the proposed method.
更多
查看译文
关键词
Ground penetrating radar, pavement, Time delay estimation, interface roughness
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要