Implementation of RTO in a large hydrogen network considering uncertainty

Optimization and Engineering(2019)

引用 9|浏览6
暂无评分
摘要
This paper describes the problems associated with the implementation of a real-time optimization (RTO) decision support tool, for the operation of a large scale hydrogen network of an oil refinery. In addition, a formulation which takes into account the stochastic uncertainty of hydrogen demand, due to hydrocarbons quality change, is described and further studied, focusing on its utility in the decision-making process of operators. An integrated robust data reconciliation, and economic optimization, considering plant-wide uncertain parameters is presented and discussed. Moreover, stochastic uncertainty in hydrogen demand is assessed for its inclusion within the RTO framework. A novel approach of the decisions stages at hydrogen producers and consumers is proposed, which supports the formulation of the problem as a two-stage stochastic non-linear program. Representative results are presented and discussed, aimed at assessing the potential impact in the hydrogen management policies. For this purpose, the value of the stochastic solution, perfect information, and expectation of the expected value are analyzed. Complementarily, a risk-averse formulation is presented (value-at-risk and conditional-value-at-risk) and its results compared against the formulation without risk considerations. Finally, some attention is given to future directions of this decision support tool, based on these work contributions, including the importance of the decision makers’ participation in the analysis of the potential impact of risk-averse results.
更多
查看译文
关键词
Process optimization,Hydrogen networks,Real-time optimization,Two-stage stochastic programming,CVaR
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要