Chrome Extension
WeChat Mini Program
Use on ChatGLM

A multi-objective robust scheduling model and solution algorithm for a novel virtual power plant connected with power-to-gas and gas storage tank considering uncertainty and demand response

Applied Energy(2019)

Cited 112|Views10
No score
Abstract
•A novel concept of power-to-gas (P2G)-based virtual power plant (GVPP) is designed.•Power-gas-power effect of GVPP brought by P2G and gas storage tank is discussed.•A multi-objective flexible risk aversion model for GVPP operation is proposed.•Payoff table of optimization model is applied for multiple iterative weighting method.•Different operation cases for verifying the proposed operation strategy are defined.
More
Translated text
Key words
Power-to-gas,Uncertainty,Demand response,Virtual power plant,Robust
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined