Receiving inspection and tests of the ITER poloidal field #4 cryostat feed-through

Frederic Villecroze,Jean Louis Bersier, Theo Brilleman, Olivier Dumoulin,Chen-yu Gung, Guillaume Jiolat, Yohanbhai Khristi, Thierry Lamiral, Antony Mariani, Laurent Nicolas,Bertrand Peluso,Roland Piccin, Eric Pignoly,Alexandre Torre,Alexander Vostner, Lijun Wan

Fusion Engineering and Design(2019)

引用 0|浏览17
暂无评分
摘要
•Feeders are the life lines of the ITER magnet system.•The PF4 CFT is the first ITER magnet component to be installed in the tokamak pit.•The Manufacture Inspection Plan (MIP) guarantees a good proficiency of the process of the Receiving, Inspection and Tests (RIT) phase.•Preliminary checks or trials are fundamentals avoiding potential future problems and saving time in the pit in the tokamak building.