Receiving inspection and tests of the ITER poloidal field #4 cryostat feed-through
Fusion Engineering and Design(2019)
摘要
•Feeders are the life lines of the ITER magnet system.•The PF4 CFT is the first ITER magnet component to be installed in the tokamak pit.•The Manufacture Inspection Plan (MIP) guarantees a good proficiency of the process of the Receiving, Inspection and Tests (RIT) phase.•Preliminary checks or trials are fundamentals avoiding potential future problems and saving time in the pit in the tokamak building.
更多查看译文
关键词
ITER,Magnets,MIFI,Feeder,Inspection