DCI-Free Based Downlink Prescheduling Scheme for Ultra-Reliable and Low Latency Communications

2018 IEEE 18th International Conference on Communication Technology (ICCT)(2018)

引用 1|浏览3
暂无评分
摘要
The fifth generation (5G) cellular network are divided into three key usage scenarios as enhanced mobile broadband, massive machine-type communications and ultra-reliable and low-latency communications (URLLC). To insure the low end-to-end delay and high reliability for users in URLLC, the overhead of physical downlink control channel (PDCCH) resource needs to be greatly increased during the scheduling process. In this paper, a downlink prescheduling scheme is proposed, where we don't need to transmit downlink control information (DCI). With this DCI-Free scheme, we can not only save PDCCH resource to support more users, but also simplify the signaling interaction to reduce the time delay. Simulation results show that the proposed scheme is able to support more users and decrease transmission delay without downlink control information in URLLC.
更多
查看译文
关键词
5G,URLLC,DCI-free,prescheduling
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要