Increasing proportion of nuclear power plants (NPPs) and prominent disparity of peak load and valley load in electric power industry has caused great difficulties to peak load regulation. It is necessary for NPPs to participate in the peak load regulation in valley load period. Equivalent peak load regulation (EPLR) of NPPs can be realized by taking advantage of flexible power units or energy storage equipment. In this paper, a two-stage dispatch strategy is proposed to realize EPLR of NPPs as well as to ensure the peak load regulation enthusiasm of power generation groups (PGGs) with flexible power equipment. Benefits of different PGGs are calculated and compensation is considered. A computation of combined heat and power system is analyzed to illustrate the performance of the dispatch strategy. The results show that the benefits of PGGs can be ensured when the EPLR of NPP is achieved.
更多
查看译文
关键词
combined heat,power,heat storage,nuclear power plant,optimal dispatch,peak load regulation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要