The Multi-Frequency ECRH System at ASDEX Upgrade - Current Status and Plans -

D. Wagner,J. Stober,M. Kircher,F. Leuterer,F. Monaco, M. Munich,M. Schubert,H. Zohm,G. Gantenbein,J. Jelonnek, M. Thumm,A. Meier,T. Scherer,D. Strauss,W. Kasparek,C. Lechte,B. Plaum,A. Zach, A.G. Litvak,G.G. Denisov,A. Chirkov, V. Malygin, L.G. Popov, V.o. Nichiporenko, V.E. Myasnikov, E.M. Tai, E.A. Solyanova

2018 43rd International Conference on Infrared, Millimeter, and Terahertz Waves (IRMMW-THz)(2018)

引用 0|浏览112
暂无评分
摘要
Last year, two more two-frequency 1 MW gyrotrons have been installed and put into operation at ASDEX Upgrade. In total 6 gyrotrons were in operation in the last experimental campaign. This year, two more gyrotrons will be installed which will bring the upgraded ECRH system to its completion. The system upgrade also includes technological advances in subsystems and loads as well as new concepts for passive protection of in-vessel components against ECRH stray radiation.
更多
查看译文
关键词
multifrequency ECRH system,ASDEX Upgrade,experimental campaign,upgraded ECRH system,system upgrade,ECRH stray radiation,two-frequency gyrotrons,in-vessel components,passive protection,power 1.0 MW
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要