Primary control reserve of electric power by feedwater flow rate change through an additional economizer – A case study of the thermal power plant “Nikola Tesla B”

Energy(2018)

引用 17|浏览3
暂无评分
摘要
Coal-fired thermal power plants (TPPs) had been generally designed to cover base loads of electricity consumption. Nowadays, they should be flexible to participate in the primary frequency control of electric system, especially because of increased number of wind and solar plants with intermittent electricity production.
更多
查看译文
关键词
Primary power control,Steam power unit,Economizer,High pressure feed water heaters,Steam extraction
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要