Genetic Algorithm-Based Method For The Deadline Problem In Repetitive Construction Projects Considering Soft Logic

JOURNAL OF MANAGEMENT IN ENGINEERING(2016)

引用 40|浏览1
暂无评分
摘要
The discrete time-cost trade-off problem (DTCTP) is a multiobjective problem usually encountered in practical projects. Current optimization methods for this problem in repetitive construction projects often assume that there is only one work sequence between units. In practice, however, the work sequence is not necessarily unchangeable. Scheduling with variable work sequences is known as the soft logic method. This study develops a mathematical model considering soft logic to address the DTCTP in repetitive construction projects. The objective is to select a set of activity modes, start times, and work sequences between units such that the total cost is minimized while meeting a given deadline. A targeted genetic algorithm is also presented, in which only the activity modes and work sequences between units are encoded, and suitable start times of all subactivities are then determined using a linear programming approach. Two example projects are analyzed, and their computation results support that applying soft logic provides more flexibility in scheduling for reducing project duration and cost.
更多
查看译文
关键词
Scheduling,Soft logic,Time-cost trade-off,Repetitive projects,Genetic algorithm
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要