Flood Control Optimal Operation on Cascade Reservoirs of Downstream Yalong River Considering Actual Running of Floodgate

Journal of Sichuan University(2014)

Cited 23|Views0
No score
Abstract
Scheduling rules and operation processes of floodgate were fully considered,and the model of flood control operation was established based on multi step progressive optimal algorithm(MSPOA).Floodgate digital representative combination strategy was proposed and dichotomy was introduced to distribute the discharged flow of reservoir to floodgates.The optimal results of two typical floods showed that computing time of MSPOA decreases 43.2% and 64.0% compared with POA,respectively.MSPOA has a faster convergence speed,and could effectively overcome the local optimal defects.The flood control operation based on MSPOA and combined strategy have good practicability and maneuverability.
More
Translated text
Key words
Water Quality Assessment
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined