Investigation of the potential to improve DC fast charging station economics by integrating photovoltaic power generation and/or local battery energy storage system
Energy(2019)
摘要
The economic feasibility of DC Fast Charging (DCFC) stations is strongly impacted by electricity charges, billed by electricity consumption (kWh) and power demand (kW), that have to be paid to the local utility. In this simulation study, the possibilities to significantly improve DCFC economics by reducing these utility charges have been investigated for DCFC stations assumed to be installed at highway service centres in Ontario and in Alberta (Canada).
更多查看译文
关键词
DC fast charging stations,Photovoltaic (PV),Battery energy storage system (BESS),Economic feasibility,Electrical vehicles
AI 理解论文
溯源树
样例
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要