Supply Chain Cost Prediction for Prefabricated Building Construction under Uncertainty

MATHEMATICAL PROBLEMS IN ENGINEERING(2018)

引用 10|浏览0
暂无评分
摘要
This paper considers the problem of predicting a supply chain cost for prefabricated building construction under an uncertain situation. Based on the Activity-Based Costing (ABC) method, we establish a computational model to estimate the total cost of the prefabricated supply chain. The model can assist in not only finding the critical areas for cost reduction of the whole supply chain but also analyzing other costs of prefabricated construction projects. Furthermore, we provide a numerical example of prefabricated building construction to validate the results.
更多
查看译文
关键词
prefabricated building construction,prediction,cost
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要