A bi-level robust planning model for active distribution networks considering uncertainties of renewable energies

International Journal of Electrical Power & Energy Systems(2019)

引用 45|浏览21
暂无评分
摘要
•A bi-level robust planning model for active management elements is proposed.•Variables in both investment level and operation level are associated together.•The planning model can be formulated as a mixed integer second order conic problem.•The renewable uncertainties in four seasons is addressed by a typical budget uncertainty set.•The two-stage robust mathematical model is solved by CCG algorithm.
更多
查看译文
关键词
Active distribution system,Second-order cone programming (SOCP),Column and constraint generation (CCG),Renewable uncertainties,Robust optimization
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要