Power Transformer Risk Index Assessment For An Asset Management Plan

2017 CHILEAN CONFERENCE ON ELECTRICAL, ELECTRONICS ENGINEERING, INFORMATION AND COMMUNICATION TECHNOLOGIES (CHILECON)(2017)

引用 6|浏览3
暂无评分
摘要
This paper presents a method for assess the risk index in a power transformers park, risk index is a metric that allows park administrator to ensure an optimal physical asset management, allocating properly financial and human resources in operation and maintenance actions. Assessing risk index requires calculating two secondary sub-index termed failure probability and consequence factor. Those indexes are integrated into the risk index value. In order to illustrate this process, 16 units risk index is evaluated, those units operates in the national Ecuadorian electric grid, results and discussion are finally presented.
更多
查看译文
关键词
Final failure, oil test, power transformer, risk index assessment
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要