Assessing the need for an update of a probabilistic seismic hazard analysis using a SSHAC Level 1 study and the Seismic Hazard Periodic Reevaluation Methodology

Nuclear Engineering and Design(2017)

引用 4|浏览11
暂无评分
摘要
•Introduces the risk-informed Seismic Hazard Periodic Reevaluation Methodology.•A new method to assess the need for updating a probabilistic seismic hazard analysis.•Considers changes in seismic hazard and engineering-based risk information.•Offers a defensible and documented approach for existing nuclear facilities.•Employs SSHAC Level 1 or 2 study as part of the decision-making process.
更多
查看译文
关键词
Seismic hazard analysis,Nuclear facility,Seismic design,Earthquake
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要