An alternative technique to the demolition of a prestressed concrete box-girder bridge: A case study
Case Studies in Construction Materials(2017)
Abstract
•The physical insight into the behavior of the prestressed systems used in the bridge.•Experimental tests presented herein considers cutting-off the strands ‘in situ’ for the release of pillar loadings before commencing the recovery procedure.•These experimental tests are a breakthrough in non-destructive tests for ‘in situ’ recovery of prestressed structures.
MoreTranslated text
Key words
Prestressed concrete box-girder bridge,Structure failure,Demolition,Recovery
AI Read Science
Must-Reading Tree
Example
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined