An alternative technique to the demolition of a prestressed concrete box-girder bridge: A case study

S.S.R. Pereira,M.D.C. Magalhaes, H. Gazzinelli

Case Studies in Construction Materials(2017)

Cited 2|Views0
No score
Abstract
•The physical insight into the behavior of the prestressed systems used in the bridge.•Experimental tests presented herein considers cutting-off the strands ‘in situ’ for the release of pillar loadings before commencing the recovery procedure.•These experimental tests are a breakthrough in non-destructive tests for ‘in situ’ recovery of prestressed structures.