Optimizing BUSSARD: The new 16-phase inverter system of ASDEX upgrade

Fusion Engineering and Design(2017)

引用 4|浏览12
暂无评分
摘要
•16 independent inverters with 1300A, 500Hz bandwidth, 5kHz switching frequency, each.•Predictive controller with 3 rt-models: 1. load control, 2. reference correction 3. syst. err. estim. to reduce ctrl latency.•PSpice models calculating the complex behaviour of imperfect decoupled inverters.
更多
查看译文
关键词
Multilevel inverter/converter (MLC),Pulse width modulation (PWM),Predictive controller,Averaging correction,Loop latency,Neutral point clamped topology (NPC),Magnetic perturbation in-vessel coils (MPC/IVC)
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要