An economy-wide evaluation of new power generation in South Africa: The case of Medupi and Kusile

Energy Policy(2016)

Cited 11|Views3
No score
Abstract
This paper investigates the role that the building of two new power stations, Medupi and Kusile, will play in facilitating future economic activity in South Africa. We use a dynamic computable general equilibrium (CGE) model to estimate the economy-wide effects of these new power stations. Our simulation results also provide insight into how much the local economy has lost due to inadequate electricity supply in the period leading up to the construction of Medupi and Kusile. We find that the decision to build additional power generation capacity was necessary and justified, and that the failure to sooner recognise the need for expansion of the country's electricity generation capacity and subsequent delays in commissioning Medupi and Kusile, likely cost the economy over R110bn in lost production. Additional analysis, in which a further two-year delay in the construction of Medupi and Kusile is simulated, shows that such an event will cause the economy to perform below baseline projections up to 2022.
More
Translated text
Key words
Computable general equilibrium,UPGEM,Electricity supply
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined