Asynchronism of ice shedding from the de-iced conductor based on heat transfer
IET Science, Measurement & Technology(2016)
摘要
When overhead line is de-iced using Joule-effect heating, which is one of the main methods for resisting ice disasters in cold regions, the ice layer on the conductor will always be shed by section. However, the asynchoronism of ice shedding based on heat transfer is ignored in almost all ice melting models of de-iced conductors. On the basis of an ice-melting simulation of a three-dimensional mod...
更多查看译文
关键词
conductors (electric),de-icing,heat transfer,melting,power transmission protection
AI 理解论文
溯源树
样例
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要