Tau/Charm Factory Accelerator Report

M. E. Biagini,R. Boni,M. Boscolo, A. Chiarucci,R. Cimino,A. Clozza,A. Drago,S. Guiducci,C. Ligi,G. Mazzitelli,R. Ricci,C. Sanelli,M. Serio,A. Stella,S. Tomassini,S. Bini, F. Cioeta, D. Cittadino, M. D'Agostino,M. Del Franco, A. Delle Piane, E. Di Pasquale, G. Frascadore, S. Gazzana,R. Gargana, S. Incremona,A. Michelotti, L. Sabbatini, G. Schillaci, M. Sedita,P. Raimondi, R. Petronzio,E. Paoloni,S. M. Liuzzo,N. Carmignani, M. Pivi

arxiv(2013)

引用 0|浏览42
暂无评分
摘要
The present Report concerns the current status of the Italian Tau/Charm accelerator project and in particular discusses the issues related to the lattice design, to the accelerators systems and to the associated conventional facilities. The project aims at realizing a variable energy Flavor Factory between 1 and 4.6 GeV in the center of mass, and succeeds to the SuperB project from which it inherits most of the solutions proposed in this document. The work comes from a cooperation involving the INFN Frascati National Laboratories accelerator experts, the young newcomers, mostly engineers, of the Cabibbo Lab consortium and key collaborators from external laboratories.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要