Protecting Cloud-Based CIs - Covert Channel Vulnerabilities at the Resource Level.Tsvetoslava Vateva-Gurova,Salman Manzoor,Rubén Trapero, Neeraj SuriIOSec@RAID(2018)引用 2|浏览19暂无评分关键词Information leakage, Scheduling, Side channels, Covert channels, FeasibilityAI 理解论文溯源树样例生成溯源树,研究论文发展脉络Chat Paper正在生成论文摘要