A Modified Min-Norm for Time Delay and Interface Roughness Estimation by Ground Penetrating Radar: Experimental Results.

IEEE Geoscience and Remote Sensing Letters(2019)

引用 4|浏览9
暂无评分
摘要
The development of methods and tools for the road infrastructure sustainable management is a research challenge, especially for nondestructive testing methods. This letter focuses on the estimation of the thickness of civil engineering structures, like pavements, and more precisely, the time delay and interface roughness. We propose a modified Min-Norm algorithm which allows efficiently estimating...
更多
查看译文
关键词
Delay effects,Ground penetrating radar,Covariance matrices,Estimation,Mathematical model
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要