Research on the pre-peak scheduling problem of public bicycle system with branch-and-price algorithm.

IJWMC(2017)

引用 1|浏览4
暂无评分
摘要
Bicycle-sharing system has got fast development in recent years; the challenge associated with its operation is reposition or scheduling the bicycle because of the fluctuating demands for bicycles and for vacant lockers at each station. This paper puts forward a pre-scheduling strategy for each node in a certain period of time before the peak period, and the solution to optimise the routing cost. A novel vehicle routing problem with revenue, and improved a branch-and-price algorithm to solve the problem are also presented. The method was applied to an instance of real operation data, and the validity of the methodology has been verified.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要