Integrating rolling stock scheduling with train unit shunting.

European Journal of Operational Research(2017)

Cited 13|Views2
No score
Abstract
•We develop two integrated frameworks for scheduling rolling stock and train unit shunting.•We provide a comparison of several methods for solving the Track Allocation Problem.•We give a counter example demonstrating the suboptimality of a previously proposed optimal method.
More
Translated text
Key words
Passenger railway optimization,Integer programming,Integration,Rolling stock,Shunting
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined