A Novel Multi-Layer Intelligent Test and Adjustment Technology for Water Injection Well

ADVANCED RESEARCH ON ENGINEERING MATERIALS, ENERGY, MANAGEMENT AND CONTROL, PTS 1 AND 2(2012)

Cited 1|Views1
No score
Abstract
The layered recovery technology has been applied to the heterogeneous multi-layer standstone oilfields for many years. However, as these standstone oilfields have been entering into the ultra-high water cut period, the conventional layered water injection technology has too long test and adjustment period and heavy workload and cannot determine the reservoir condition. To solve this problem, this paper proposes and develops an intelligent multi-layer water injection technology suitable for the ultra-high water cut period based on the synchronous dynamic test and adjustment idea. The whole flow adjustment process has no any intervention and the synchronous dynamic flow adjustment of each layer finishes by the digital clock calibration thereby avoiding interlayer interference. This technology also can obtain data by the redisplay of computer. The experimental results show that this technology not only improves water injection effect and reduces the field workload, but also provides the basis of data analysis for implementation and adjustment of meticulous oil development plan.
More
Translated text
Key words
Water Injection Well,Ultra-high Water Cut Period,Dynamic Test and Adjustment
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined