First-Year Performance of a 20-MW $_{\rm ac}$ PV Power Plant

IEEE Journal of Photovoltaics(2012)

Cited 31|Views1
No score
Abstract
After one year of continuous operation in Ontario, Canada, the measured performance of the Sarnia 20-MW $_{\rm ac}$ power plant can be compared with both the long-term energy prediction and the expected energy for the operating year 2010. Based on the first-year's data at Enbridge's Sarnia 20-MW$_{\rm ac}$ power plant, the power plant is operating 2.1% above the long-term prediction, which is well...