The Application Of High Pressure Jetting Drilling In Eastern Sichuan

INTERNATIONAL JOURNAL OF OIL GAS AND COAL TECHNOLOGY(2014)

引用 4|浏览0
暂无评分
摘要
Based on the problem of the low rate of penetration (ROP) of well sections above Xujiahe formation (mainly sandstone and mudstone) in Eastern Sichuan, Southwest of China, this paper discusses the feasibility of a high pressure jetting drilling scheme in this area and analyses its mechanism of increasing ROP. The paper establishes a physical model of borehole flow path at bottom hole and applied the numerical simulation method to simulate the bottom hole flow field under high pressure jetting circumstance. Reasonable hydraulic parameters are recommended after analysing the influence of pump pressure, flow rate and nozzle combination on bottom hole flow field. According to the simulation results, high pressure jetting drilling tests were performed successfully in this area. The statistical results have demonstrated that high pressure jetting drilling could significantly improve the ROP of well sections above Xujiahe formation in Eastern Sichuan.
更多
查看译文
关键词
high pressure jetting drilling, rate of penetration, ROP, numerical simulation, bottom hole flow field, pump pressure, flow rate, nozzle combination, oil technology, China
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要