谷歌Chrome浏览器插件
订阅小程序
在清言上使用

Geotechnical Investigations for the Design of Foundation of the Bridge across Danube River in Novi Sad—Yugoslavia

Deep Foundations 2002(2002)

引用 23|浏览0
暂无评分
摘要
Destruction of three bridges across the Danube river in Novi Sad, in the April of 1999. — during NATO bombing, caused the traffic interruption on the international highway. Belgrade-Novi Sad-Subotica, which is a part of Europian highway E-75 and international railway line Ankara-Wien. In efforts to ease the life-problems to the population of Novi Sad, it was decided to build temporary railway-road bridge, in the shortest term that is possible. The bridge is located about 75 m upstream from the destroyed concrete arch bridge system. In spite of extremely short term, the complex geotechnical investigations and foundation analyses of the columns founded on piles were performed successfully. The bridge was built in the 8 months period of time and the building process was completed in the April of 2000.
更多
查看译文
关键词
geotechnical investigations,danube river,bridge,novi sad—yugoslavia
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要