LATEST DEVELOPMENTS AT THE ESRF

J. C. Biasci,J. Chavanne,P. Elleaume,L. Farvacque,L. Hardy,J. Jacob, E. Plouviez, J. L. Revol

msra(2002)

引用 25|浏览7
暂无评分
摘要
After nine years of operation for users, the ESRF reliability reached a record uptime of 96.8% in 2001. In parallel to the effort to improve the operation, the upgrade of machine performances is being pursued. This paper will present an overview of the on-going developments. Tests to increase the current from 200 mA to 300 mA have been successfully initiated. Beam position stability has been further refined using a feedback and the installation of damping links on the magnet girders. Increased brilliance and extended tunability of undulators to higher energies are achieved with the operation of 4 in- vacuum undulators at gaps of 6 mm. Front-ends are being upgraded to withstand the power generated by 5 m long, 11 mm gap undulators. The test of the super-conducting SOLEIL type RF cavity is in full swing. The feasibility study of the Ultimate Storage Ring Light Source is under way.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要