Chrome Extension
WeChat Mini Program
Use on ChatGLM

The integrated lot sizing and cutting stock problem in a furniture factory

IFAC Proceedings Volumes(2013)

Cited 8|Views4
No score
Abstract
This work studies the integrated lot sizing and cutting stock problem, where the goal is to capture the dependency that exists between two important decisions in the production process, in order to economize raw materials and also reduce production and inventory costs. The integrated lot sizing and cutting stock problem is studied in a small furniture factory that produces wardrobes, dressing tables and cupboards and the lot sizing and cutting stock decisions are taken by the production manager. A column-generation technique is used to solve a linear relaxation of the proposed model. The computational results, using real data from the factory, show that it is possible to reduce total inventory and raw material costs when integrated planning is used.
More
Translated text
Key words
Two-dimensional cutting stock,Lot sizing,Furniture industry,Combinatorial optimization
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined