Status Of The Jaeri Tandem Accelerator And Its Booster

S Takeuchi, S Abe,S Hanashima, K Horie,N Ishizaki, S Kanda,M Matsuda, I Ohuchi,H Tayama, Y Tsukihashi, T Yoshida

HEAVY ION ACCELERATOR TECHNOLOGY(1999)

引用 0|浏览3
暂无评分
摘要
The JAERI tandem accelerator has been operating effectively since 1982 and heavy ions from the tandem has been boosted in energy by the superconducting independently phased booster linac for the experiments at higher bombarding energies since 1994. Present operating status of the tandem accelerator and its booster, status of their use for experiments and an on-going improvement project with an ECR ion source an described.
更多
查看译文
关键词
linear accelerator
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要