Chrome Extension
WeChat Mini Program
Use on ChatGLM

Seepage Cut-off Wall Detection of Reservoir Based on Groundvue Series of Ground Penetrating Radar

Baoyuan Yuan, Yongjun Li,Yun Bai

PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ARCHITECTURAL, CIVIL AND HYDRAULICS ENGINEERING (ICACHE 2015)(2016)

Cited 0|Views2
No score
Abstract
In order to find out the serious and long plagued leakage problems related to the seepage cut-off wall of Nanmenxia Reservoir, used the introduced British Groundvue series of Ground Penetrating Radar equipment, field test and verify work were implied, leakage location and path were determined. The results showed that the seepage cut-off wall of dam foundation is well, its thickness is around 0.50m, but it has the horizontal distance of about 3m away from the current grouting platform, which may be one important cause that the previous grouting effects are bad. This provided important support for the Reinforcement Project of Nanmenxia Reservoir.
More
Translated text
Key words
Ground Penetrating Radar,Groundvue series,Nanmenxia Reservoir,seepage cut-off wall,detection
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined