Chrome Extension
WeChat Mini Program
Use on ChatGLM

Soil layer displacing plough with a corn stalk collector – Part 2: Construction of a watertable underground

Engineering in Agriculture, Environment and Food(2015)

Cited 0|Views29
No score
Abstract
Fuxin, a major corn production area, is located in Liaoning province, P. R. of China. The annual precipitation in this area is only 450 mm, mostly during summer. The area receives less rainfall in spring seeding season every year. Droughts in spring are common. We constructed an artificial perched watertable by burying corn stalks. The results showed that before watertable construction, the soil penetration resistance was 5.0 MPa below 200 mm depth. After construction, that became 1.0 MPa down to 400 mm depth. The watertable construction evened out available N, P2O5 and K2O and organic matter in all layers. Therefore, when the top soil and the subsoil were displaced, a deficiency of any chemical element for plants would not be caused.
More
Translated text
Key words
Drought,Underground,Watertable,Corn stalks,Burying
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined