Delay Analysis Of Ieee 802.15.6 Use Of Emergency Medical Services On Human Body Communication
6TH EUROPEAN CONFERENCE OF THE INTERNATIONAL FEDERATION FOR MEDICAL AND BIOLOGICAL ENGINEERING(2015)
摘要
Networking with various healthcare devices on human body is one of the targeted applications of the IEEE 802.15.6 standard. Among those, human body communication is considered to have better performance in terms of power consumption and security for implanted and swallowable devices. Different from general applications of BAN, healthcare device network with implanted/swallowable devices requires a better understanding of the necessary time delay for the emergency messages transmission. In this article, we analyzed the delay of emergency message transmission based on IEEE802.15.6 at HBC. Both theoretical analysis and simulation were employed to calculate the average and shortest transmission delay, and also the distribution of the transmission delay at multi-user multi-UPs for slotted Aloha access protocol.
更多查看译文
关键词
IEEE 802.15.6, HBC, MAC, Emergency
AI 理解论文
溯源树
样例
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要