Optimisation of track geometry inspection interval

PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT(2014)

引用 30|浏览3
暂无评分
摘要
The measurement and improvement of track quality are key issues in determining the time at which railway maintenance must be performed and its cost. Efficient track maintenance ensures optimum allocation of limited maintenance resources which has an enormous effect on maintenance efficiency. Applying an appropriate tamping strategy helps reduce maintenance costs, making operations more cost-effective and leading to increased safety and passenger comfort levels. This paper discusses optimisation of the track geometry inspection interval with a view to minimising the total ballast maintenance costs per unit traffic load. The proposed model considers inspection time, the maintenance-planning horizon time after inspection and takes into account the costs associated with inspection, tamping and risk of accidents due to poor track quality. It draws on track geometry data from the iron ore line (Malmbanan) in northern Sweden, used by both passenger and freight trains, to find the probability distribution of geometry faults.
更多
查看译文
关键词
Track geometry degradation,maintenance,inspection interval,optimisation,tamping
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要