谷歌浏览器插件
订阅小程序
在清言上使用

Verification test results of a cutting technique for the ITER blanket cooling pipes

Fusion Engineering and Design(2012)

引用 6|浏览9
暂无评分
摘要
For replacement of the first wall (FW) of the international thermonuclear experimental reactor (ITER), cutting and welding tools for the cooling pipes must be able to access a pipe from the surface side of the FW and cut/weld the pipe from the inside the cooling pipe (inner diameter: 42.72mm, thickness: 2.77mm). The cutting tool for the pipe end is required to cut a flat plate circularly from the surface side of the FW (cutting diameter: approximately 44mm, plate thickness: 5mm). To determine the specifications for both the tools and the blanket hydraulic connections, the ITER Organization (IO) and the Japan Domestic Agency (JADA) conducted research and development activities regarding the FW replacement. This paper describes the current status of the development of cutting tools for the cooling pipe connection.
更多
查看译文
关键词
ITER,Blanket,Remote maintenance,Pipe cutting
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要