Assembly and gap management strategy for the ITER NBI vessel passive magnetic shield

Fusion Engineering and Design(2015)

引用 0|浏览48
暂无评分
摘要
Abstract The neutral beam system for ITER consists of two heating and current drive neutral ion beam injectors (HNB) and a diagnostic neutral beam (DNB) injector. The proposed physical plant layout allows a possible third HNB injector to be installed later. The HNB Passive Magnetic Shield (PMS) works in conjunction with the active compensation/correction coils to limit the magnetic field inside the Beam Line Vessel (BLV), Beam Source Vessel (BSV), High Voltage Bushing (HVB) and Transmission Line (TL) elbow to acceptable levels that do not interfere with the operation of the HNB components. This paper describes the current design of the PMS, having had only minor modifications since the preliminary design review (PDR) held in IO in April 2013, and the assembly strategy for the vessel PMS.
更多
查看译文
关键词
Neutral beam injector,Passive magnetic shield,Assembly,Pre-assembly,Gap management
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要