Multiobjective planning for naval mine counter measures missions

International Journal of Operational Research(2012)

引用 3|浏览9
暂无评分
摘要
Near-optimal scheduling and allocation for DoD missions is complicated by many factors, including multiple measures of effectiveness, mixed-initiatives, heterogeneity of systems and non-uniformity of homogenous systems; these factors contribute to a complex planning problem with non-linear, combinatorial, and continuous components that is further complicated by information uncertainty. In Navy, mine counter measure missions, planning entails components of the vehicle routing problem with time windows and flexible flowshop scheduling with pre-emptive maintenance. We present a multiobjective mine counter measures problem formulation and describe the non-dominated scheduler, a scheduling programme that parametrically explores continuous dimensions of the decision space, stochastically samples from exponentially large decision spaces, and uses surrogate metrics to bound computational complexity. This provides mission commander with a non-dominated set of alternative plans. This scheduler has been integrated into existing tools and is being evaluated by the US Navy for extension and integration into next-generation mine warfare decision aids.
更多
查看译文
关键词
heuristic,scheduling
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要