Engineering Problems Of Tokamak T-15 Electromagnet System Reconstruction

IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY(2012)

Cited 5|Views62
No score
Abstract
Currently reconstruction is initiated on the T-15 tokamak at the Institute of Tokamak Physics, NRC "Kurchatov Institute". The purpose of the reconstruction is to build the facility with a small aspect ratio A = 2.2, elongated cross-section (k = 1.8) and the divertor with a major radius of 1.67 m, long plasma current pulse of 2 MA up to 10 s and powerful auxiliary plasma heating (up to 15 MW). The facility is intended for demonstration of the plasma steady-state burning with high parameters for physics research to support the ITER program and program for development of volumetric neutron sources. The reconstruction involves replacement of the existing superconducting TF magnet system and cryoresistive PF system by the "warm" system. The developed magnet system provides the above-mentioned tokamak parameters. The magnet system of the new facility use of the T-10 and T-15 infrastructure, thus essentially determinig the choice of its main parameters
More
Translated text
Key words
Electromagnetic system design, medium aspect ratio, T-15 infrastructure, T-15 reconstruction, tokamak
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined