Project time and cost estimate at completion based on non-parametric resampling with interval risk

International Journal of Industrial and Systems Engineering(2015)

引用 0|浏览4
暂无评分
摘要
Control and feedback in complex and sensitive systems with different resources and properties in uncertainty conditions are one of the significant challenges for project managers. Therefore, in this paper, an integrated model with quantitative and qualitative approach based on earned value management and risk analysis methods proposed to decrease deviations in time and cost estimation at complete (EAC(t) and EAC). Using the proposed performance indexes based on risk scores obtained by non-parametric resampling technique, namely bootstrap, calculating more accurate estimations of final cost and duration at lower and upper band with various confidence levels will be possible. Finally, an illustrative case study presented demonstrating the proposed model can be efficiently applied through real case software projects.
更多
查看译文
关键词
software engineering,risk assessment,project management,evm,earned value management
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要