Large wind integration challenges and solutions for operations and system reliability

Miami, FL, USA(2009)

Cited 0|Views6
No score
Abstract
Bonneville Power Administration is experiencing an unprecedented growth of wind generation resources in its Balancing Authority Area. In order to accommodate the amount of wind that is planned, BPA has had to create new processes in order to limit the amount of balancing resources being used due to the variation of wind. The calculation of the balancing resource requirements and the resulting short-term solutions will be discussed, and then the presentation will evolve to the solutions that are being worked on in BPA and across the industry, including multiple national labs, to mitigate the effects of variable generation on an interconnection.
More
Translated text
Key words
permittivity,propagation constant,tensile stress,permeability,hydrogen,reliability,magnetic fields,surface waves
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined